Capability template for procurement and suppliers
Vendor quote comparison
Before anyone signs, the person choosing a vendor gets one sheet: the criteria agreed first, every quote costed the same way, and each vendor eliminated with its reason, on hold with the question that settles it, or shortlisted with its trade-offs. A person chooses; contract terms go to your reviewer.
The outcome
Choosing between quotes stops being a matter of whichever sales call went best. The criteria are written down and agreed before a single quote is compared, so nobody quietly moves the goalposts toward a favorite. Every quote is costed over the same months, with one-off charges, price rises and separately priced extras counted, so a low monthly fee cannot hide a higher bill.
Then the field narrows in plain steps. A vendor that misses a must-have is out, with its own words quoted. A vendor over the budget is out, with the amount. A vendor that costs more and is no better on anything that matters is out, with the vendor that beats it named. What is left is a short list and a clear trade-off: this one is cheaper and faster, that one services more often.
Nobody is eliminated for something their quote simply does not mention; they are put on hold with a question ready to send. Promises made on a call count for nothing until they are in writing. The person who owns the budget makes the choice, and whoever reviews your contracts reads the terms before anything is signed.
Who starts the work, and when
The office manager, buyer or owner who gathered the quotes starts it once at least two are in, and runs it again whenever a vendor answers a question or sends a revised quote.
Before any of that, the owner or budget holder agrees the criteria: what would rule a vendor out, which qualities count among those that qualify, the most they will spend, and how long they want to commit for. If those are not written down yet, the capability asks those questions and stops there.
What they supply
- A short brief: what is being bought and what prompted it, the start date wanted and the date the choice must be made.
- The agreed criteria: the must-haves, the measures that matter with which way is better, the budget ceiling, the number of months to cost over, and what every price must include.
- The quotes, as the vendors sent them.
- Notes from calls and emails, if there are any, so verbal promises can be set aside rather than counted.
No connection to email, a purchasing system or any vendor portal is needed, and none is asked for.
What comes out
One comparison sheet, in a fixed order:
- The quotes and the criteria, with the date the criteria were agreed and any quote that expires before the decision date.
- Cost over the term for every vendor, with the arithmetic shown.
- Side by side: what each quote says against each criterion, or "not stated".
- Not counted: promises that appear only in call notes, and claims a vendor makes about itself with nothing behind them.
- Three rounds: must-haves, then budget, then outperformed, each naming who went out and why.
- Where each vendor stands, in one line each, and the shortlist with what each vendor is better and worse on.
- For the contract reviewer: renewal, notice, price-change and similar terms, quoted word for word.
- Questions for vendors drafted for a person to send, and the decisions for the person who chooses.
Good looks like this: anyone can point at a vendor and find, in one line, why it is still in or why it is out.
An invented example
Illustrative example with invented data. The firm, the vendors, the quotes, the notes and every figure below are invented. The firm is an invented 28-person accounting practice choosing a new office-cleaning contractor. Its office manager gathered six quotes; the managing partner chooses, and the firm's outside lawyer reads contract terms. People are referred to by role and vendors by letter.
The inputs come first, in full, so the template can be run on them. The comparison sheet follows.
The inputs
1. Purchase brief
What: evening office cleaning, one floor, 6,000 sq ft, five nights a week.
Reason: the current contractor's agreement ends on 30 November 2026.
Start wanted: on or before Tuesday 1 December 2026.
Decision needed by: Friday 20 November 2026.
Commitment wanted: 12 months.
Prepared by: office manager, Monday 9 November 2026.
Currency: US dollars.
2. Criteria sheet (agreed with the managing partner on Monday 2 November 2026, before any quote was compared)
Must-haves
M1 Cleaning starts no earlier than 6:00 pm on weekdays.
M2 The quote states general liability cover of at least $1,000,000.
M3 Service can start on or before 1 December 2026.
Comparison criteria
Cost over the term: lower is better.
C1 Restroom service, days per week: higher is better.
C2 Time to fix a reported missed clean, hours: lower is better.
Budget ceiling: $28,000 over 12 months.
Cost period: 12 months from the start date.
Every price must cover: restroom and kitchen supplies (paper, soap, bin
liners), either included or priced separately.
3. The quotes (typed copies; the order is the order received)
VENDOR A, quote dated 4 November 2026. Valid for 14 days.
Evening cleaning five nights a week, crew arrives 6:30 pm. Restrooms
serviced five days a week. Missed cleans fixed within 24 hours of a
report. Restroom and kitchen supplies included. Monthly fee $2,150.
Initial deep clean, one-off, $600. We carry general liability cover of
$2,000,000. Earliest start 16 November 2026. Carpet shampoo once a year
included. This agreement renews automatically for further 12-month
periods unless either party gives 60 days' written notice before the
renewal date. Rates may increase by up to 5% at each renewal.
VENDOR B, quote dated 3 November 2026. Valid until 30 November 2026.
Our crews work 5:00 pm to 9:00 pm, five nights a week. Restrooms five
days a week. Missed cleans fixed within 12 hours. Supplies included.
Monthly fee $1,780. General liability cover $1,000,000. Start 23
November 2026. Twelve-month agreement.
VENDOR C, quote dated 5 November 2026. Valid until 15 December 2026.
Cleaning from 7:00 pm, five nights a week. Restrooms serviced Monday,
Wednesday and Friday. Missed cleans fixed within 12 hours. Monthly fee
$1,950. Restroom and kitchen supplies $140 per month. Rates increase by
4% from the seventh month of service. General liability cover
$1,000,000. Start 1 December 2026. Either party may end this agreement
with 30 days' written notice. Rated the region's top cleaner by our
customers.
VENDOR D, quote dated 2 November 2026. Valid until 2 December 2026.
Cleaning begins no earlier than 6:00 pm, five nights a week. Restrooms
five days a week. Missed cleans fixed within 24 hours. Supplies
included. Monthly fee $2,300, no set-up charge. General liability cover
$1,000,000. Start 23 November 2026.
VENDOR E, quote dated 6 November 2026. Valid until 6 December 2026.
Crew arrives 6:30 pm, five nights a week. Restrooms five days a week.
Missed cleans fixed within 24 hours. Supplies included. Monthly fee
$1,690. Set-up visit, one-off, $400. Start 1 December 2026. Service is
month to month.
VENDOR F, quote dated 4 November 2026. Valid until 4 December 2026.
Cleaning from 8:00 pm, five nights a week. Restrooms five days a week.
Missed cleans fixed within 4 hours. Supplies included. Interior window
cleaning every quarter included. Monthly fee $2,600. General liability
cover $2,000,000. Start 30 November 2026.
4. Notes from calls (typed by the office manager)
5 Nov, Vendor A, call with their account manager: said they could do
restrooms six days a week at no extra cost if we asked.
6 Nov, Vendor E, call with their owner: said "we're fully insured, no
problem". Insurance is not in the written quote.
The comparison sheet
VENDOR QUOTE COMPARISON: evening office cleaning, one floor, 6,000 sq ft, five nights a week
- For: managing partner. Prepared by: office manager on 9 November 2026. Decision needed by: 20 November 2026.
- Criteria agreed: 2 November 2026, by the managing partner. Criteria changed after the quotes were read: none.
- Quotes compared: 6. Notes: supplied.
- Vendor A: quote dated 4 November 2026, valid until 18 November 2026 (14 days from the quote date), start 16 November 2026. EXPIRES BEFORE THE DECISION DATE
- Vendor B: quote dated 3 November 2026, valid until 30 November 2026, start 23 November 2026.
- Vendor C: quote dated 5 November 2026, valid until 15 December 2026, start 1 December 2026.
- Vendor D: quote dated 2 November 2026, valid until 2 December 2026, start 23 November 2026.
- Vendor E: quote dated 6 November 2026, valid until 6 December 2026, start 1 December 2026.
- Vendor F: quote dated 4 November 2026, valid until 4 December 2026, start 30 November 2026.
The criteria
- Must-haves: M1 cleaning starts no earlier than 6:00 pm on weekdays. M2 the quote states general liability cover of at least $1,000,000. M3 service can start on or before 1 December 2026.
- Comparison: cost over 12 months, lower is better. C1 restroom service, days per week, higher is better. C2 time to fix a reported missed clean, hours, lower is better.
- Budget ceiling: $28,000 over 12 months. Every price must cover: restroom and kitchen supplies.
Cost over the term
- Vendor A: $600 one-off + $2,150 × 12 = $25,800; supplies included = $26,400.
- Vendor B: $1,780 × 12 = $21,360; supplies included = $21,360.
- Vendor C: $1,950 × 6 = $11,700 + $2,028 (after the 4% rise) × 6 = $12,168 + supplies $140 × 12 = $1,680 = $25,548.
- Vendor D: $2,300 × 12 = $27,600; supplies included = $27,600.
- Vendor E: $400 one-off + $1,690 × 12 = $20,280; supplies included = $20,680.
- Vendor F: $2,600 × 12 = $31,200; supplies included = $31,200.
Side by side
- Vendor A: M1 "crew arrives 6:30 pm". M2 "$2,000,000". M3 "16 November 2026". Cost $26,400. C1 5. C2 24. Also offered, not compared: carpet shampoo once a year.
- Vendor B: M1 "5:00 pm to 9:00 pm". M2 "$1,000,000". M3 "23 November 2026". Cost $21,360. C1 5. C2 12. Also offered, not compared: none.
- Vendor C: M1 "from 7:00 pm". M2 "$1,000,000". M3 "1 December 2026". Cost $25,548. C1 3. C2 12. Also offered, not compared: none.
- Vendor D: M1 "no earlier than 6:00 pm". M2 "$1,000,000". M3 "23 November 2026". Cost $27,600. C1 5. C2 24. Also offered, not compared: none.
- Vendor E: M1 "crew arrives 6:30 pm". M2 not stated. M3 "1 December 2026". Cost $20,680. C1 5. C2 24. Also offered, not compared: none. Commitment offered: "Service is month to month"; wanted: 12 months.
- Vendor F: M1 "from 8:00 pm". M2 "$2,000,000". M3 "30 November 2026". Cost $31,200. C1 5. C2 4. Also offered, not compared: interior window cleaning every quarter.
Not counted
- Vendor A: restrooms six days a week at no extra cost. Not in writing: in the notes of 5 November, not in the quote. Bears on C1.
- Vendor C: "Rated the region's top cleaner by our customers." Vendor's own claim, not checked. Bears on no criterion.
- Vendor E: "we're fully insured, no problem". Not in writing: in the notes of 6 November, not in the quote. Bears on M2.
Round 1: must-haves
- Eliminated: Vendor B, M1: "Our crews work 5:00 pm to 9:00 pm".
- On hold: Vendor E, M2: in the notes only; the quote does not state the cover.
- Passed: A, C, D, F.
Round 2: budget
- Eliminated: Vendor F, $31,200, $3,200 over the ceiling.
- On hold: none.
- Passed: A, C, D.
Round 3: outperformed
- Compared: A, C, D.
- Eliminated: Vendor D, outperformed by Vendor A: cost $26,400 against $27,600; C1 5 against 5; C2 24 against 24.
- Not comparable: none.
Where each vendor stands
- Vendor A: shortlisted.
- Vendor B: eliminated in round 1: crews work from 5:00 pm; M1 needs no earlier than 6:00 pm.
- Vendor C: shortlisted.
- Vendor D: eliminated in round 3: outperformed by Vendor A, which costs $1,200 less and matches it on C1 and C2.
- Vendor E: on hold: the quote does not state general liability cover (M2). Cost over the term $20,680.
- Vendor F: eliminated in round 2: $31,200, $3,200 over the $28,000 ceiling.
The shortlist
- Vendor A: better on C1, restrooms 5 days a week against 3 for Vendor C. Worse on cost, $26,400 against $25,548 ($852 more), and on C2, 24 hours against 12.
- Vendor C: better on cost, $25,548 against $26,400 ($852 less), and on C2, 12 hours against 24. Worse on C1, restrooms 3 days a week against 5.
For the contract reviewer
- Vendor A: "This agreement renews automatically for further 12-month periods unless either party gives 60 days' written notice before the renewal date." "Rates may increase by up to 5% at each renewal."
- Vendor C: "Rates increase by 4% from the seventh month of service." "Either party may end this agreement with 30 days' written notice."
- Vendor E: "Service is month to month."
- Quoted for the firm's outside lawyer; not interpreted.
Questions for vendors (drafts for a person to send)
- Vendor E, M2: Please confirm in writing, as part of your quote, the general liability cover you carry and its amount. We need at least $1,000,000 stated in the quote.
- Vendor A, C1: On our call of 5 November you mentioned restroom service six days a week at no extra cost. If that is your offer, please add it to the written quote.
- Vendor A, quote validity: Your quote is valid until 18 November and our decision is due on 20 November. Can you extend it to 20 November?
Decisions for the managing partner
- Choose between Vendor A ($26,400, restrooms 5 days a week, missed cleans fixed within 24 hours) and Vendor C ($25,548, restrooms 3 days a week, fixed within 12 hours), or wait for Vendor E's answer on insurance before choosing. Vendor E's cost over the term is $20,680.
- Vendor A's quote expires on 18 November, two days before the decision date: decide by 18 November, or wait for the answer on an extension.
Before anything is signed, the firm's outside lawyer reads the terms above.
Status: prepared for the managing partner's choice. Nothing has been sent, accepted, ordered or signed.
Where it fits
- Procurement and suppliers, which owns choosing vendors and keeping the record of why.
- Professional services, where an office manager buys cleaning, IT support and equipment with no purchasing team.
- Construction, where subcontractor and equipment-hire quotes arrive in different shapes and have to be read on one basis.
- Manufacturing, where a supplier of a regular material or a maintenance contract is chosen on price, lead time and service together.
- Hospitality, where linen, waste, pest-control and food-supply contracts come up for choice every year.
- Established businesses, where purchases have been chosen on habit and a written reason makes the next choice easier.
What has to change for your company
- Who chooses and who reads contracts. Name the budget holder who agrees the criteria and makes the choice, and the person who reviews contract terms.
- Your standing must-haves. Insurance cover, start dates or service hours you always require can start each list, edited each time.
- Your cost period. Twelve months for a service contract is common; equipment may be costed over its expected life.
- What every price must include, for each kind of purchase you make often.
- Your budget rule. Whether a ceiling is always set, and who may raise it.
- Your platform. It runs in ChatGPT, Claude, Copilot or Gemini. Decide which documents the assistant may read.
What has been checked
Fully Powered AI wrote this capability template. It was editorially reviewed on 9 November 2026. It was tried once on its invented example in Claude on 9 November 2026, and the record of that run is published with the template; it lists the small edits made afterward that have not been run again. It has not yet been tested in a client environment. It has not yet been tested as a packaged version in ChatGPT, Claude, Copilot or Gemini.
Testing in your environment means running it on two or three past purchases your team remembers, with hard cases written in advance: a quote silent on a must-have, a price rise halfway through the year, an extra priced separately, a promise made only on a call. The person who chooses checks every figure against the quotes before anyone relies on the sheet. Pilot acceptance-test preparation sets those cases up, and what we test before we call an AI workflow ready describes the record we keep.
The full capability template
Everything above is the outline. The complete capability template is the working version: the roles, the inputs, the procedure, the exceptions and stop conditions, the output format, the reviewer checklist, the acceptance tests, the instructions for an AI assistant and what to customize for your company. It comes with a download and the link to its folder in Fully Powered’s public repository.
Free with an account. Sign in by email: no password and no card.
Next step
Bring a real piece of this work to a call. We’ll walk through what it takes to fit this capability to your rules, prove it on your work and put it in the hands of the roles that own it.