Workflows Directory

Find your team’s next superpower.

Results

29 workflow templates, showing 1 to 24

  • Ad to page check

    When a campaign's landing page is ready for a prelaunch check, the acquisition owner gets a findings list that sets each ad beside the captured page: message, offer details, form and next step, on mobile and desktop. Page states nobody captured are marked unknown.

    Starts it
    Acquisition owner
    Brings
    export, notes
    Gets
    4 outputs
  • Business insurance renewal review

    Before the business insurance renews, the owner gets one pack: every policy with insurer, limits, deductibles, premium and dates; renewal terms beside expiring ones, every change marked; what changed in the business; claims; and questions for the broker. The broker and the owner decide all cover.

    Starts it
    Owner
    Brings
    export, notes, document
    Gets
    8 outputs
    • Procurement and suppliers (filtered by)
    • Growth & scaling (filtered by)
    • Construction
  • Carrier performance review

    The shipping lead gets a lane-by-lane comparison of carriers from the delivery export and the freight charges: on-time delivery, damage, tracking gaps and cost, each with the shipments behind it. A person decides whether to raise issues or change carrier.

    Starts it
    Shipping lead
    Brings
    export, notes
    Gets
    5 outputs
  • Category sourcing plan

    For the buyer or operations lead who owns one spend category, such as packaging or IT hardware: its spend and suppliers on one page, where it sits on a supply-risk and spend matrix, the value levers the evidence supports, and a dated sourcing plan. A person chooses the approach.

    Starts it
    Buyer
    Brings
    export, notes
    Gets
    7 outputs
    • Procurement and suppliers (filtered by)
    • Growth & scaling (filtered by)
    • Consumer brands
  • Component end-of-life exposure brief

    When a supplier announces a component constraint or end-of-life date, the sourcing lead gets one brief: where the part is used, stock and demand set against the stated dates, and questions about replacements, with unverified availability kept apart from approved supply.

    Starts it
    Sourcing lead
    Brings
    export, notes, pasted text
    Gets
    5 outputs
  • Component inventory audit

    When patterns come up for review, the design-system owner gets an inventory built from the library export and its documentation: every component with its naming, token and state gaps, and the pairs that may overlap. Nothing is merged on appearance; the owner decides.

    Starts it
    Design-system owner
    Brings
    export, notes
    Gets
    4 outputs
  • Component specification

    When an approved reusable component needs documenting, the design-system owner gets one specification of its variants, states, usage rules and accessibility notes, set beside the existing patterns, with every gap or clash written as a choice for the owner.

    Starts it
    Design-system owner
    Brings
    export, notes
    Gets
    6 outputs
  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

    Starts it
    Operations manager
    Brings
    export, notes, document
    Gets
    7 outputs
    • Procurement and suppliers (filtered by)
    • Growth & scaling (filtered by)
    • Construction
  • Current experience baseline

    Before a redesign, the design lead gets a baseline built from the captures and page list they supply: each page read with its content and design observations, the patterns that recur, and the pages outside the evidence. The lead confirms the baseline and sets the scope.

    Starts it
    Design lead
    Brings
    export, notes, document
    Gets
    6 outputs
  • Dental lab case tracker

    The office coordinator keeps one tracker of every case at an outside dental lab: when it went, the lab's due date against the patient's seating, which cases are overdue or due back too late, each remake with its stated reason, and each lab's on-time record for the quarter. A person calls every lab.

    Starts it
    Office coordinator
    Brings
    export, notes
    Gets
    4 outputs
  • Design handoff record

    Before engineering starts, the design owner gets one record built from the approved design: every state, token, breakpoint and content rule either covered or flagged, with each unstated behaviour written as a question. The engineer confirms the questions are resolved.

    Starts it
    Design owner
    Brings
    export, notes
    Gets
    6 outputs
  • Estimate basis pack

    An estimator pricing a job from drawings, takeoffs and supplier quotes gets one worksheet: every figure with its quantity source, rate source and date beside it, each exclusion listed and every gap already written as a scope question. The estimator verifies; the bid lead decides the figure.

    Starts it
    Estimator
    Brings
    export, notes
    Gets
    4 outputs
    • Sales
    • Procurement and suppliers (filtered by)
    • Growth & scaling (filtered by)
  • Inbound receiving exception trace

    When what arrived does not match the advance shipment notice, the receiving supervisor or inventory controller gets the notice, the packing list and the scans side by side by item and lot, with missing references and questions to investigate. Nothing is adjusted and nobody is contacted.

    Starts it
    Receiving supervisor
    Brings
    export, notes
    Gets
    5 outputs
  • Journey accessibility findings

    When a user journey is ready for accessibility review, the reviewer gets a finding list: each finding with its task impact and evidence, the manual checks still required and the limits of the review. The reviewer verifies every finding and agrees fixes with the design owner.

    Starts it
    Accessibility reviewer
    Brings
    export, notes
    Gets
    5 outputs
  • Lead form field review

    When a client questions a long inquiry form or abandoned submissions, the conversion lead gets a field-by-field review: what each field is used for downstream, where people leave, and proposed labels, error messages and test questions. The lead and the client's data owner decide every change.

    Starts it
    Conversion lead
    Brings
    export, notes, document
    Gets
    6 outputs
  • Menu input cost change review

    When supplier prices change, the chef and food-and-beverage manager get one worksheet: each price movement tied to the quantities in the supplied recipes, the cost per portion of every affected dish before and after, and questions for the chef. It sets no menu price.

    Starts it
    Chef
    Brings
    export, notes
    Gets
    5 outputs
  • Order size comparison

    When a supplier offers a bigger discounted order, the inventory planner gets each quantity costed the same way: yearly cost, cash tied up, months of cover and storage fit. The planner chooses the quantity; nothing is ordered.

    Starts it
    Inventory planner
    Brings
    export, notes
    Gets
    6 outputs
  • Pilot build readiness brief

    Before a prototype or pilot build, the build lead gets one brief: part shortages, revision conflicts and open actions set against the team’s own build checklist, with allocated parts kept apart from received ones. People confirm; nothing is released.

    Starts it
    Build lead
    Brings
    export, notes, document
    Gets
    7 outputs
  • RFQ clarification list

    A buyer sending drawings and specifications out for quotation gets one list of missing details, conflicting revisions and ambiguous tolerances, and a record of each supplier's answers. The buyer approves every message; the engineer settles every technical question.

    Starts it
    Buyer
    Brings
    export, notes, pasted text
    Gets
    6 outputs
    • Procurement and suppliers (filtered by)
    • Growth & scaling (filtered by)
    • Engineering firms
  • Software subscription and vendor spend review

    From a card statement or ledger export, the finance or operations lead gets every subscription on one register: what each costs a year, who owns it, what renews in the next 90 days, what looks unused, duplicated or orphaned, and the decisions to make. Nothing is cancelled or changed.

    Starts it
    Finance lead
    Brings
    export, notes
    Gets
    9 outputs
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Supplier delivery date check

    The purchasing or operations person gets one comparison from the open purchase orders and the supplier replies: promised and revised dates side by side, the orders each change puts at risk, and the follow-ups still unanswered. No supplier is contacted.

    Starts it
    Buyer
    Brings
    export, notes
    Gets
    5 outputs
  • Supplier issue notice

    When a supplier bills for more than was ordered or received, or falls short of an agreed delivery or quality target, the buyer gets a formal notice ready for approval: each problem set against the record, the evidence listed, what the supplier must do and the date to reply by. A person approves and sends it.

    Starts it
    Buyer
    Brings
    export, notes, document
    Gets
    3 outputs
    • Procurement and suppliers (filtered by)
    • Growth & scaling (filtered by)
    • Construction
  • Supplier performance scorecard

    Once a quarter, the buyer or operations lead scores each key supplier from the business's own order and receiving exports: on-time delivery, fill rate, defects and returns, price against agreed terms and order confirmations, with the trend, the evidence behind every score and the points to raise. A person decides.

    Starts it
    Buyer
    Brings
    export, notes
    Gets
    6 outputs
    • Procurement and suppliers (filtered by)
    • Growth & scaling (filtered by)
    • Consumer brands