  • Audit evidence index

    The quality lead gets an index of everything an audit has asked to see: each request linked to the document that answers it, its version and owner, the records found and the gaps. The quality owner decides what is shared; nothing is certified or sent.

    Starts it
    Quality lead
    Brings
    export, notes
    Gets
    6 outputs
  • Deliverable issue completeness check

    As a calculation, report or drawing package nears issue, the quality reviewer or document controller gets a checklist: missing review records, revisions that disagree between the index, the register and the title block, and citations of out-of-date calculations. Issue stays with the engineers.

    Starts it
    Quality reviewer
    Brings
    export, notes
    Gets
    5 outputs
    • Quality management (filtered by)
    • Engineering firms (filtered by)
    • Construction
  • Emissions activity data schedule

    When the reporting period closes, the environmental reporting owner gets one source-linked schedule of energy, fuel and transport quantities with units and the boundary supplied, estimates kept apart from measured activity, missing factor references and gaps listed. It calculates no emissions figure.

    Starts it
    Environmental reporting owner
    Brings
    export, notes
    Gets
    5 outputs
  • Engineering change affected records index

    When an engineering change request enters review, the document controller gets one index: the assemblies, revisions, stock and open purchase orders the change reaches in the exports supplied, and a question for each owner wherever the records are unclear.

    Starts it
    Document controller
    Brings
    export, notes
    Gets
    3 outputs
  • Lone work arrangements review

    For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.

    Starts it
    Operations manager
    Brings
    export, notes
    Gets
    6 outputs
    • Health, safety and environment (filtered by)
    • Energy (filtered by)
    • Construction
  • Punch list consolidation

    The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
  • RFI review package

    The project engineer gets one packet for each request for information: the register entry, the question word for word, the drawing revisions and specification extracts it touches, earlier responses, and a numbered list of what is unresolved. No answer is proposed.

    Starts it
    Project engineer
    Brings
    export, notes, pasted text
    Gets
    8 outputs
  • Site observation follow-up

    After a site visit, the visiting engineer and the project manager get one observation report: each field note beside its location, source photograph, drawing revision and any earlier register entry, a proposed follow-up owner, and the questions still open. It assesses no condition.

    Starts it
    Visiting engineer
    Brings
    export, notes
    Gets
    5 outputs
    • Quality management (filtered by)
    • Engineering firms (filtered by)
    • Construction
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Temporary change register

    For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs