Workflows Directory

Find your team’s next superpower.

Results

5 workflow templates

  • Design assumption change register

    When client criteria or design assumptions change, the project engineer gets one sourced register: what changed, which recorded requirements it touches, how firm each source is, and what still needs confirmation. No design basis is altered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
    • Project and delivery (filtered by)
    • Energy (filtered by)
    • Construction
  • Engineering change affected records index

    When an engineering change request enters review, the document controller gets one index: the assemblies, revisions, stock and open purchase orders the change reaches in the exports supplied, and a question for each owner wherever the records are unclear.

    Starts it
    Document controller
    Brings
    export, notes
    Gets
    3 outputs
  • Lone work arrangements review

    For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.

    Starts it
    Operations manager
    Brings
    export, notes
    Gets
    6 outputs
  • Service visit work packet

    Before a planned visit to a turbine, inverter or terminal asset, the maintenance supervisor gets one packet built from the logs and approved scope supplied: reported symptoms, previous visits, open parts requests and access questions. It judges no condition and sends nothing.

    Starts it
    Maintenance supervisor
    Brings
    export, notes
    Gets
    7 outputs
    • Operations and process improvement (filtered by)
    • Project and delivery (filtered by)
    • Energy (filtered by)
  • Temporary change register

    For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs