Workflows Directory

Find your team’s next superpower.

Results

25 workflow templates, showing 1 to 24

  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

    Starts it
    Operations manager
    Brings
    export, notes, document
    Gets
    7 outputs
  • Cost of poor quality worksheet

    An owner or operations lead who senses that rework, scrap and returns are costly gets one worksheet: the failure costs already on record, sorted by category, with estimates, gaps and unresolved allocations listed. The owner decides what to fix first.

    Starts it
    Owner
    Brings
    export, notes
    Gets
    6 outputs
    • Quality management
    • Operations and process improvement (filtered by)
    • Construction (filtered by)
  • Culture health check

    A founder or people lead sees whether the company's stated values show up in daily work: each value written as behaviours you could watch for, read against the team's own evidence, with where practice matches, where it drifts, and two or three rituals to try. Reported by team and theme, never about a person.

    Starts it
    Founder
    Brings
    export, notes, document
    Gets
    7 outputs
  • Employee health plan comparison

    For an owner or people lead at renewal: the broker's health plan options next to each other, with premiums split between company and employee, deductibles, out-of-pocket limits, network notes, the cost to the company and to a typical employee at low, middle and high use, and questions for the broker.

    Starts it
    People lead
    Brings
    export, notes, pasted text
    Gets
    6 outputs
  • Incident investigation and corrective actions

    After an injury, near miss or property damage, the site, operations or safety manager gets the investigation written up from the evidence: a timeline, the immediate and underlying causes, actions with owners and dates, and a register that follows each action until a check shows it worked.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    8 outputs
  • Lone work arrangements review

    For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.

    Starts it
    Operations manager
    Brings
    export, notes
    Gets
    6 outputs
  • Nonconformity record draft

    A quality lead or supervisor who has spotted something wrong gets a draft record: the observation set against the stated requirement, the affected work counted from the register, and the containment options. The quality owner decides every call.

    Starts it
    Quality lead
    Brings
    export, notes
    Gets
    1 output
    • Quality management
    • Operations and process improvement (filtered by)
    • Construction (filtered by)
  • Payroll preparation and timesheet review

    Before each payroll run, the owner gets one sheet built from the timesheet and roster exports: hours by person and type, every missing punch and odd entry raised as a question, and an estimated total. Nothing is keyed in, submitted or paid until a person approves.

    Starts it
    Payroll clerk
    Brings
    export, notes
    Gets
    7 outputs
  • Premortem before a decision

    Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.

    Starts it
    Owner
    Brings
    notes
    Gets
    4 outputs
  • Process map and bottleneck review

    Map one process step by step: who does each step, how long work waits and how long it takes, where it is handed over and where it gets sent back. Then find the one step that caps how much gets finished, and what to try there first. The owner decides what changes.

    Starts it
    Operations lead
    Brings
    export, notes
    Gets
    7 outputs
  • Project handover readiness check

    When a finished deliverable is ready for the team that will run it, the project manager brings one checklist against that team's own requirements: acceptance evidence, instructions, access, training, support owners and open items. The receiving owner accepts or names the conditions still to meet.

    Starts it
    Project manager
    Brings
    export, notes
    Gets
    6 outputs
  • Project lessons review

    When a phase or a project ends, the project manager gets one blameless review: whether it achieved what it was for, how scope, schedule and budget moved and why, whether the success measures were the right ones, and practice changes for the team to choose, each with an owner and a follow-up date.

    Starts it
    Project manager
    Brings
    export, notes
    Gets
    8 outputs
  • Project status report

    The lead of an internal project gets a status report the sponsor can read in two minutes: each workstream red, amber or green with the reason, what moved, who must clear each blocker, the decisions needed and the dates at risk. No milestone is called done without evidence, and the lead confirms every status.

    Starts it
    Project lead
    Brings
    export, notes, pasted text
    Gets
    7 outputs
  • Property diligence index

    The transaction lead gets a diligence room in order: every document indexed by workstream, every checklist item and request tracked, and every open finding tied to the report or request that raised it. Specialists judge the findings; nothing is valued or sent.

    Starts it
    Transaction coordinator
    Brings
    export, notes
    Gets
    5 outputs
  • Punch list consolidation

    The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
  • Repeat incident pattern review

    A safety lead with a year of incident records and earlier actions gets them compared in groups: confirmed causes, what was done before, and where incidents recur, with questions for the team. A competent person judges what the pattern means.

    Starts it
    Investigation lead
    Brings
    export, notes
    Gets
    6 outputs
  • Safety walk follow-up

    After a safety walk, the manager gets a follow-up brief that ties each concern workers raised to the commitment the manager made, its owner and due date, and the message to give back. Gaps arrive as questions, never as guesses.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    5 outputs
  • Site safety induction pack

    For one named site, the site, facilities or people lead gets an induction built from that site's own emergency arrangements, rules and hazards, with a short check of understanding, a sign-off record for each person and refresher dates by role. A competent person approves it and delivers it.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    6 outputs
    • People and HR (filtered by)
    • Operations and process improvement (filtered by)
    • Construction (filtered by)
  • Staff newsletter and FAQ roundup

    Each month the office manager turns what teams send in into one staff newsletter, with answers to the questions people keep asking, each quoted from an approved source and its owner named. Nothing about one person's pay, health or performance goes in, and a person approves the issue before it goes.

    Starts it
    Office manager
    Brings
    export, notes, document
    Gets
    2 outputs
  • Stakeholder and decision rights map

    Before kickoff, the project manager holds one map of everyone the project touches: each group placed by influence and interest, every key decision with exactly one accountable owner, the decision makers still missing, and who hears what, when and from whom. The sponsor confirms every decision right.

    Starts it
    Project manager
    Brings
    export, notes, document
    Gets
    6 outputs
  • Temporary change register

    For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
  • Vendor insurance certificate check

    For a property manager collecting insurance certificates from service vendors: each certificate's fields set beside the requirements the team already approved, every stated expiration date listed, and draft requests for what is missing. The manager reviews gaps with the insurance adviser before accepting anything.

    Starts it
    Property manager
    Brings
    export, notes, document, pasted text
    Gets
    9 outputs
  • Volunteer shift options

    A volunteer lead gets draft shift options once an event's availability replies are in: each role's needs set against who volunteered, the requirements on record and the shifts already confirmed, with every uncovered position shown. The lead checks and confirms; nothing is assigned or sent.

    Starts it
    Volunteer lead
    Brings
    export, notes
    Gets
    4 outputs
    • People and HR (filtered by)
    • Operations and process improvement (filtered by)
    • Nonprofits (filtered by)
  • Workflow fit check: is this piece of work ready for AI?

    Before you build anything, run one piece of work through six checks and get a straight answer on one short page: build it, build one part, do something simpler first, not yet, or leave it with your people. The owner decides what gets built first, with the reasons in front of them.

    Starts it
    Owner
    Brings
    notes, pasted text
    Gets
    6 outputs
    • Operations and process improvement (filtered by)
    • Construction (filtered by)
    • Growth & scaling