Workflows Directory

Find your team’s next superpower.

Results

21 workflow templates

  • Bid or no-bid and RFP response plan

    Before anyone starts on a response, your bid manager sees every requirement in the request checked against your own evidence, your bid criteria tested and the buyer questions ready. A named person decides whether to bid; then a dated plan says who does what by when.

    Starts it
    Bid manager
    Brings
    export, notes, document
    Gets
    6 outputs
    • Sales (filtered by)
    • Construction (filtered by)
    • Government (filtered by)
  • Cost of poor quality worksheet

    An owner or operations lead who senses that rework, scrap and returns are costly gets one worksheet: the failure costs already on record, sorted by category, with estimates, gaps and unresolved allocations listed. The owner decides what to fix first.

    Starts it
    Owner
    Brings
    export, notes
    Gets
    6 outputs
  • Deliverable issue completeness check

    As a calculation, report or drawing package nears issue, the quality reviewer or document controller gets a checklist: missing review records, revisions that disagree between the index, the register and the title block, and citations of out-of-date calculations. Issue stays with the engineers.

    Starts it
    Quality reviewer
    Brings
    export, notes
    Gets
    5 outputs
  • Engineering change affected records index

    When an engineering change request enters review, the document controller gets one index: the assemblies, revisions, stock and open purchase orders the change reaches in the exports supplied, and a question for each owner wherever the records are unclear.

    Starts it
    Document controller
    Brings
    export, notes
    Gets
    3 outputs
  • Estimate basis pack

    An estimator pricing a job from drawings, takeoffs and supplier quotes gets one worksheet: every figure with its quantity source, rate source and date beside it, each exclusion listed and every gap already written as a scope question. The estimator verifies; the bid lead decides the figure.

    Starts it
    Estimator
    Brings
    export, notes
    Gets
    4 outputs
  • Evaluation unit trial review

    When a customer's evaluation reaches its review milestone, the account engineer and account owner get a trial-review agenda that sets the agreed use case beside the recorded results, setup changes and feedback, with every gap turned into a question and next-step options.

    Starts it
    Account engineer
    Brings
    export, notes
    Gets
    4 outputs
  • Incident investigation and corrective actions

    After an injury, near miss or property damage, the site, operations or safety manager gets the investigation written up from the evidence: a timeline, the immediate and underlying causes, actions with owners and dates, and a register that follows each action until a check shows it worked.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    8 outputs
  • Nonconformity record draft

    A quality lead or supervisor who has spotted something wrong gets a draft record: the observation set against the stated requirement, the affected work counted from the register, and the containment options. The quality owner decides every call.

    Starts it
    Quality lead
    Brings
    export, notes
    Gets
    1 output
  • Obsolete copy check

    The quality lead gets the master document list set against the copies found at each point of use: which copies are out of date, which withdrawn documents are still held, and what proof of withdrawal exists. The document owner withdraws and replaces copies; nothing is changed.

    Starts it
    Document controller
    Brings
    export, notes
    Gets
    6 outputs
  • Outgoing work sign-off log

    Every item that needs a responsible attorney's sign-off before it leaves the firm sits in one log, in the order it has to go out: waiting, approved or returned, with the attorney's own note. Anything close to its date with no decision is flagged first. The log tracks status and never touches the legal substance.

    Starts it
    Operations manager
    Brings
    export, notes, pasted text
    Gets
    6 outputs
  • Process map and bottleneck review

    Map one process step by step: who does each step, how long work waits and how long it takes, where it is handed over and where it gets sent back. Then find the one step that caps how much gets finished, and what to try there first. The owner decides what changes.

    Starts it
    Operations lead
    Brings
    export, notes
    Gets
    7 outputs
  • Project experience sheet

    For one finished project and one proposal, turn the firm's approved project records into a one-page experience sheet: the firm's role, the scope it performed, partners' work kept apart, and the record behind each line. Names, images and permissions still to confirm are listed for sign-off.

    Starts it
    Proposal lead
    Brings
    export, notes, pasted text
    Gets
    6 outputs
  • Punch list consolidation

    The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
  • Referral source follow-up

    The day after a partner meets someone who sends the firm work, they have a follow-up draft and a list of every promise made at the table, by both sides. The draft uses only approved materials and nothing said in confidence; the partner checks it, chooses the next step and sends it.

    Starts it
    Partner
    Brings
    export, notes
    Gets
    5 outputs
  • Repeat incident pattern review

    A safety lead with a year of incident records and earlier actions gets them compared in groups: confirmed causes, what was done before, and where incidents recur, with questions for the team. A competent person judges what the pattern means.

    Starts it
    Investigation lead
    Brings
    export, notes
    Gets
    6 outputs
  • RFI review package

    The project engineer gets one packet for each request for information: the register entry, the question word for word, the drawing revisions and specification extracts it touches, earlier responses, and a numbered list of what is unresolved. No answer is proposed.

    Starts it
    Project engineer
    Brings
    export, notes, pasted text
    Gets
    8 outputs
  • Site observation follow-up

    After a site visit, the visiting engineer and the project manager get one observation report: each field note beside its location, source photograph, drawing revision and any earlier register entry, a proposed follow-up owner, and the questions still open. It assesses no condition.

    Starts it
    Visiting engineer
    Brings
    export, notes
    Gets
    5 outputs
  • SOP exception capture

    Turn what your most experienced person does with the awkward cases into an exception register for one procedure. Once the owner approves it, every colleague handles those cases the way your best person does.

    Starts it
    Operations lead
    Brings
    notes, document
    Gets
    2 outputs
  • Spreadsheet check before sharing

    Before a model or schedule goes to a client, a lender or a board, the sender gets one report on it: every error value, short total, buried assumption and hidden row pinned to its cell, each with a fix or a question, and a plain list of what was not checked. Nothing in the workbook is changed.

    Starts it
    Finance manager
    Brings
    export, notes
    Gets
    5 outputs
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Weekly owner business brief

    Each Monday the owner gets about one page built from the exports they supply: cash, last week's sales against the week before, pipeline movement, the week's commitments and a watch list, with one item to look at first. Every figure names its source, and every missing export is named.

    Starts it
    Owner
    Brings
    export, notes
    Gets
    8 outputs
    • Leadership
    • Sales (filtered by)
    • Construction (filtered by)