Workflows Directory
Find your team’s next superpower.
- Function: Quality management
- Industry: Construction
- Industry: Engineering firms
- Industry: Hospitality
- Business situation: Established businesses
- Clear all filters
Results
12 workflow templates
Audit evidence index
The quality lead gets an index of everything an audit has asked to see: each request linked to the document that answers it, its version and owner, the records found and the gaps. The quality owner decides what is shared; nothing is certified or sent.
- Starts it
- Quality lead
- Brings
- export, notes
- Gets
- 6 outputs
Cost of poor quality worksheet
An owner or operations lead who senses that rework, scrap and returns are costly gets one worksheet: the failure costs already on record, sorted by category, with estimates, gaps and unresolved allocations listed. The owner decides what to fix first.
- Starts it
- Owner
- Brings
- export, notes
- Gets
- 6 outputs
Deliverable issue completeness check
As a calculation, report or drawing package nears issue, the quality reviewer or document controller gets a checklist: missing review records, revisions that disagree between the index, the register and the title block, and citations of out-of-date calculations. Issue stays with the engineers.
- Starts it
- Quality reviewer
- Brings
- export, notes
- Gets
- 5 outputs
Incident investigation and corrective actions
After an injury, near miss or property damage, the site, operations or safety manager gets the investigation written up from the evidence: a timeline, the immediate and underlying causes, actions with owners and dates, and a register that follows each action until a check shows it worked.
- Starts it
- Site manager
- Brings
- export, notes, document
- Gets
- 8 outputs
Nonconformity record draft
A quality lead or supervisor who has spotted something wrong gets a draft record: the observation set against the stated requirement, the affected work counted from the register, and the containment options. The quality owner decides every call.
- Starts it
- Quality lead
- Brings
- export, notes
- Gets
- 1 output
Obsolete copy check
The quality lead gets the master document list set against the copies found at each point of use: which copies are out of date, which withdrawn documents are still held, and what proof of withdrawal exists. The document owner withdraws and replaces copies; nothing is changed.
- Starts it
- Document controller
- Brings
- export, notes
- Gets
- 6 outputs
Process map and bottleneck review
Map one process step by step: who does each step, how long work waits and how long it takes, where it is handed over and where it gets sent back. Then find the one step that caps how much gets finished, and what to try there first. The owner decides what changes.
- Starts it
- Operations lead
- Brings
- export, notes
- Gets
- 7 outputs
Punch list consolidation
The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.
- Starts it
- Site manager
- Brings
- export, notes
- Gets
- 7 outputs
Repeat incident pattern review
A safety lead with a year of incident records and earlier actions gets them compared in groups: confirmed causes, what was done before, and where incidents recur, with questions for the team. A competent person judges what the pattern means.
- Starts it
- Investigation lead
- Brings
- export, notes
- Gets
- 6 outputs
RFI review package
The project engineer gets one packet for each request for information: the register entry, the question word for word, the drawing revisions and specification extracts it touches, earlier responses, and a numbered list of what is unresolved. No answer is proposed.
- Starts it
- Project engineer
- Brings
- export, notes, pasted text
- Gets
- 8 outputs
Site observation follow-up
After a site visit, the visiting engineer and the project manager get one observation report: each field note beside its location, source photograph, drawing revision and any earlier register entry, a proposed follow-up owner, and the questions still open. It assesses no condition.
- Starts it
- Visiting engineer
- Brings
- export, notes
- Gets
- 5 outputs
Submittal register review
The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.
- Starts it
- Project engineer
- Brings
- export, notes
- Gets
- 6 outputs