Workflows Directory

Find your team’s next superpower.

Results

13 workflow templates

  • Audit evidence index

    The quality lead gets an index of everything an audit has asked to see: each request linked to the document that answers it, its version and owner, the records found and the gaps. The quality owner decides what is shared; nothing is certified or sent.

    Starts it
    Quality lead
    Brings
    export, notes
    Gets
    6 outputs
  • Budget-versus-actual variance commentary

    Before the month's results go to management, the finance lead gets written commentary on every line that moved past the threshold: the figures, the budget owner's explanation marked confirmed or to be confirmed, a bridge from budget to actual, and the questions still open. No cause is invented.

    Starts it
    Finance lead
    Brings
    export, notes, pasted text
    Gets
    7 outputs
  • Deliverable issue completeness check

    As a calculation, report or drawing package nears issue, the quality reviewer or document controller gets a checklist: missing review records, revisions that disagree between the index, the register and the title block, and citations of out-of-date calculations. Issue stays with the engineers.

    Starts it
    Quality reviewer
    Brings
    export, notes
    Gets
    5 outputs
    • Quality management (filtered by)
    • Engineering firms (filtered by)
    • Construction
  • Funder report draft

    Before a funder report is due, the grants manager gets a draft written to the funder's own questions, with every number tied to a record, an index of the evidence behind each statement and a list of what is still unanswered. People verify it, approve it and submit it.

    Starts it
    Grants manager
    Brings
    export, notes, document
    Gets
    4 outputs
  • Hiring pipeline status report

    Each week your people lead or founder sees every open role on one page: applications at each stage, days open against the target, roles running late, pass-through between stages, which sources lead to interviews, and every blocker with its owner. It counts; it never assesses a candidate.

    Starts it
    People lead
    Brings
    export, notes, document
    Gets
    6 outputs
  • Program outcome map

    Before an evaluation, the program and evaluation leads get one map linking each activity to the outcome it is meant to serve, with proposed measures, data sources, assumptions and the questions the evidence cannot yet answer. It claims no impact.

    Starts it
    Program lead
    Brings
    export, notes
    Gets
    8 outputs
    • Analytics and reporting (filtered by)
    • Nonprofits (filtered by)
    • Education
  • Punch list consolidation

    The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
  • RFI review package

    The project engineer gets one packet for each request for information: the register entry, the question word for word, the drawing revisions and specification extracts it touches, earlier responses, and a numbered list of what is unresolved. No answer is proposed.

    Starts it
    Project engineer
    Brings
    export, notes, pasted text
    Gets
    8 outputs
  • Site observation follow-up

    After a site visit, the visiting engineer and the project manager get one observation report: each field note beside its location, source photograph, drawing revision and any earlier register entry, a proposed follow-up owner, and the questions still open. It assesses no condition.

    Starts it
    Visiting engineer
    Brings
    export, notes
    Gets
    5 outputs
    • Quality management (filtered by)
    • Engineering firms (filtered by)
    • Construction
  • Spreadsheet check before sharing

    Before a model or schedule goes to a client, a lender or a board, the sender gets one report on it: every error value, short total, buried assumption and hidden row pinned to its cell, each with a fix or a question, and a plain list of what was not checked. Nothing in the workbook is changed.

    Starts it
    Finance manager
    Brings
    export, notes
    Gets
    5 outputs
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Website findability audit

    An owner or marketer asking why the website is not found gets a plain report from saved copies of their own pages: what stops each page being reached, read or understood, the fixes in order, and the checks only a live look can settle. No ranking is promised.

    Starts it
    Owner
    Brings
    notes, document
    Gets
    7 outputs
  • Win-loss review

    Once a quarter your sales lead sees, from the deals you closed, where the losses ended, which kinds of deal you win and lose, what the largest deals show, and which findings rest on enough deals to act on. Actions are proposed in proportion to the evidence, and nothing in your sales system is changed.

    Starts it
    Sales lead
    Brings
    export, notes, document, pasted text
    Gets
    8 outputs
    • Sales
    • Analytics and reporting (filtered by)
    • Engineering firms (filtered by)