Workflows Directory

Find your team’s next superpower.

Results

4 workflow templates

  • Design assumption change register

    When client criteria or design assumptions change, the project engineer gets one sourced register: what changed, which recorded requirements it touches, how firm each source is, and what still needs confirmation. No design basis is altered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
    • Project and delivery (filtered by)
    • Energy (filtered by)
    • Construction
  • Emissions activity data schedule

    When the reporting period closes, the environmental reporting owner gets one source-linked schedule of energy, fuel and transport quantities with units and the boundary supplied, estimates kept apart from measured activity, missing factor references and gaps listed. It calculates no emissions figure.

    Starts it
    Environmental reporting owner
    Brings
    export, notes
    Gets
    5 outputs
  • Engineering change affected records index

    When an engineering change request enters review, the document controller gets one index: the assemblies, revisions, stock and open purchase orders the change reaches in the exports supplied, and a question for each owner wherever the records are unclear.

    Starts it
    Document controller
    Brings
    export, notes
    Gets
    3 outputs
  • Service visit work packet

    Before a planned visit to a turbine, inverter or terminal asset, the maintenance supervisor gets one packet built from the logs and approved scope supplied: reported symptoms, previous visits, open parts requests and access questions. It judges no condition and sends nothing.

    Starts it
    Maintenance supervisor
    Brings
    export, notes
    Gets
    7 outputs