Workflows Directory

Find your team’s next superpower.

Results

28 workflow templates, showing 1 to 24

  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

    Starts it
    Operations manager
    Brings
    export, notes, document
    Gets
    7 outputs
  • Cost of poor quality worksheet

    An owner or operations lead who senses that rework, scrap and returns are costly gets one worksheet: the failure costs already on record, sorted by category, with estimates, gaps and unresolved allocations listed. The owner decides what to fix first.

    Starts it
    Owner
    Brings
    export, notes
    Gets
    6 outputs
  • Course catalog quality check

    The registrar's office gets one comparison of a department's course updates against the current catalog export: codes, titles, credits, descriptions and linked components, row by row, with every conflict set out as a question for academic review. No catalog record is changed.

    Starts it
    Catalog coordinator
    Brings
    export, document
    Gets
    5 outputs
  • Course sequence and workload review

    A course lead revising an outline for the next cohort gets a module map: learning goals, prerequisites, activities and the instructor's own time estimates, with crowded weeks and coverage gaps marked and every gap written as a question. The course lead decides what changes.

    Starts it
    Course lead
    Brings
    export, notes
    Gets
    4 outputs
    • People and HR
    • Quality management (filtered by)
    • Education (filtered by)
  • Deliverable issue completeness check

    As a calculation, report or drawing package nears issue, the quality reviewer or document controller gets a checklist: missing review records, revisions that disagree between the index, the register and the title block, and citations of out-of-date calculations. Issue stays with the engineers.

    Starts it
    Quality reviewer
    Brings
    export, notes
    Gets
    5 outputs
  • Employee health plan comparison

    For an owner or people lead at renewal: the broker's health plan options next to each other, with premiums split between company and employee, deductibles, out-of-pocket limits, network notes, the cost to the company and to a typical employee at low, middle and high use, and questions for the broker.

    Starts it
    People lead
    Brings
    export, notes, pasted text
    Gets
    6 outputs
  • Ergonomic review inputs

    For a supervisor preparing for an ergonomics assessor or a worker's complaint about a task: a task observation record of each step's movements, durations, loads and measurements as supplied, the measurements still missing, and what the people who do the task said.

    Starts it
    Supervisor
    Brings
    export, notes
    Gets
    4 outputs
  • Inbox triage

    The owner, or the assistant who keeps their inbox, starts the day knowing what needs a reply today, what can wait and until when, and what belongs to someone else, with a draft or a forwarding note for each. Nothing is sent, archived, deleted or moved, and no mailbox login is needed.

    Starts it
    Executive assistant
    Brings
    export, notes, pasted text
    Gets
    6 outputs
  • Incident investigation and corrective actions

    After an injury, near miss or property damage, the site, operations or safety manager gets the investigation written up from the evidence: a timeline, the immediate and underlying causes, actions with owners and dates, and a register that follows each action until a check shows it worked.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    8 outputs
  • Leadership meeting rhythm

    Your chief executive gets a proposed calendar of leadership forums and written reports, built from today's meetings and the decisions left waiting: each forum with its purpose, inputs, attendees, frequency and one decision owner, and the hours it gives back. The chief executive chooses; no calendar is changed.

    Starts it
    Chief executive
    Brings
    export, notes
    Gets
    7 outputs
  • Lone work arrangements review

    For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.

    Starts it
    Operations manager
    Brings
    export, notes
    Gets
    6 outputs
  • Nonconformity record draft

    A quality lead or supervisor who has spotted something wrong gets a draft record: the observation set against the stated requirement, the affected work counted from the register, and the containment options. The quality owner decides every call.

    Starts it
    Quality lead
    Brings
    export, notes
    Gets
    1 output
  • Obsolete copy check

    The quality lead gets the master document list set against the copies found at each point of use: which copies are out of date, which withdrawn documents are still held, and what proof of withdrawal exists. The document owner withdraws and replaces copies; nothing is changed.

    Starts it
    Document controller
    Brings
    export, notes
    Gets
    6 outputs
  • Premortem before a decision

    Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.

    Starts it
    Owner
    Brings
    notes
    Gets
    4 outputs
  • Process map and bottleneck review

    Map one process step by step: who does each step, how long work waits and how long it takes, where it is handed over and where it gets sent back. Then find the one step that caps how much gets finished, and what to try there first. The owner decides what changes.

    Starts it
    Operations lead
    Brings
    export, notes
    Gets
    7 outputs
  • Punch list consolidation

    The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
  • Repeat incident pattern review

    A safety lead with a year of incident records and earlier actions gets them compared in groups: confirmed causes, what was done before, and where incidents recur, with questions for the team. A competent person judges what the pattern means.

    Starts it
    Investigation lead
    Brings
    export, notes
    Gets
    6 outputs
    • Health, safety and environment (filtered by)
    • Quality management (filtered by)
    • Construction (filtered by)
  • Research summary brief

    An executive handed a pile of reports, articles or papers gets one brief: what each source found, where the sources agree and disagree, the limits of each, and exact quotations cited to the page. Built only from the documents supplied. What it means for the business stays the reader's call.

    Starts it
    Analyst
    Brings
    notes, document
    Gets
    7 outputs
  • RFI review package

    The project engineer gets one packet for each request for information: the register entry, the question word for word, the drawing revisions and specification extracts it touches, earlier responses, and a numbered list of what is unresolved. No answer is proposed.

    Starts it
    Project engineer
    Brings
    export, notes, pasted text
    Gets
    8 outputs
  • Safety walk follow-up

    After a safety walk, the manager gets a follow-up brief that ties each concern workers raised to the commitment the manager made, its owner and due date, and the message to give back. Gaps arrive as questions, never as guesses.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    5 outputs
  • Site observation follow-up

    After a site visit, the visiting engineer and the project manager get one observation report: each field note beside its location, source photograph, drawing revision and any earlier register entry, a proposed follow-up owner, and the questions still open. It assesses no condition.

    Starts it
    Visiting engineer
    Brings
    export, notes
    Gets
    5 outputs
  • Site safety induction pack

    For one named site, the site, facilities or people lead gets an induction built from that site's own emergency arrangements, rules and hazards, with a short check of understanding, a sign-off record for each person and refresher dates by role. A competent person approves it and delivers it.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    6 outputs
    • People and HR
    • Health, safety and environment (filtered by)
    • Construction (filtered by)
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Temporary change register

    For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs