Workflows Directory
Find your team’s next superpower.
- Function: Health, safety and environment
- Function: Procurement and suppliers
- Industry: Education
- Industry: Real estate
- Clear all filters
Results
8 workflow templates
Contractor safety prequalification
For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.
- Starts it
- Operations manager
- Brings
- export, notes, document
- Gets
- 7 outputs
Lone work arrangements review
For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.
- Starts it
- Operations manager
- Brings
- export, notes
- Gets
- 6 outputs
Preventive maintenance plan
For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.
- Starts it
- Facilities manager
- Brings
- export, notes
- Gets
- 6 outputs
Recurring repair service history
When repeated maintenance keeps disturbing guests, the facilities manager gets one brief by equipment and room area: repeated work orders, confirmed service interruptions and missing inspection records side by side. It finds no cause and orders no work.
- Starts it
- Facilities manager
- Brings
- export, notes
- Gets
- 5 outputs
Submittal register review
The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.
- Starts it
- Project engineer
- Brings
- export, notes
- Gets
- 6 outputs
Teaching tool vendor data questions
Before a school or college adopts a teaching tool that would handle student or staff information, the privacy or procurement lead gets a scoped question pack on data flows, access, retention and subprocessors, with each supplied vendor document mapped to the questions and the gaps listed.
- Starts it
- Privacy lead
- Brings
- export, notes, document
- Gets
- 5 outputs
Three-week look-ahead constraint review
Before the coordination meeting, the superintendent gets a brief that sets each planned activity of the next three weeks beside what could hold it up: trades sharing an area, unfinished predecessors, open approvals, late deliveries and unanswered RFIs. The superintendent confirms the sequence and assigns the follow-up.
- Starts it
- Project engineer
- Brings
- export, notes
- Gets
- 7 outputs
Vendor insurance certificate check
For a property manager collecting insurance certificates from service vendors: each certificate's fields set beside the requirements the team already approved, every stated expiration date listed, and draft requests for what is missing. The manager reviews gaps with the insurance adviser before accepting anything.
- Starts it
- Property manager
- Brings
- export, notes, document, pasted text
- Gets
- 9 outputs