Workflows Directory

Find your team’s next superpower.

Results

33 workflow templates, showing 25 to 33

  • Shipment documentation check

    When a job finishes, the shipping or quality lead gets one index comparing the order, the inspection records, the required certificates and the packing details, with each missing record and each quantity that does not agree set out. Nothing is certified or released.

    Starts it
    Shipping lead
    Brings
    export, notes
    Gets
    6 outputs
  • Site observation follow-up

    After a site visit, the visiting engineer and the project manager get one observation report: each field note beside its location, source photograph, drawing revision and any earlier register entry, a proposed follow-up owner, and the questions still open. It assesses no condition.

    Starts it
    Visiting engineer
    Brings
    export, notes
    Gets
    5 outputs
  • Site safety induction pack

    For one named site, the site, facilities or people lead gets an induction built from that site's own emergency arrangements, rules and hazards, with a short check of understanding, a sign-off record for each person and refresher dates by role. A competent person approves it and delivers it.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    6 outputs
    • People and HR
    • Health, safety and environment (filtered by)
    • Construction (filtered by)
  • SOP exception capture

    Turn what your most experienced person does with the awkward cases into an exception register for one procedure. Once the owner approves it, every colleague handles those cases the way your best person does.

    Starts it
    Operations lead
    Brings
    notes, document
    Gets
    2 outputs
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Supplier quality response check

    A quality or purchasing person who has raised a defect with a supplier gets the supplier's reply set against the finding: what is answered, what is not, the evidence still to ask for, the actions proposed and what has yet to be verified. The person decides whether the answer is accepted.

    Starts it
    Supplier-quality owner
    Brings
    export, notes, document, pasted text
    Gets
    7 outputs
  • Temporary change register

    For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
    • Health, safety and environment (filtered by)
    • Construction (filtered by)
    • Manufacturing (filtered by)
  • Workplace risk assessment

    For one task or workplace, the site or operations manager gets each hazard, who could be harmed, the controls already in place, a likelihood-and-severity rating before and after, and further controls with an owner and a date, ready for a competent person to review and sign.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    6 outputs
    • Health, safety and environment (filtered by)
    • Construction (filtered by)
    • Manufacturing (filtered by)
  • Write an SOP from how the work is done

    Turn a walkthrough of how one piece of work is really done into a written procedure anyone on the team can follow: who does each step, how they know it is done, what to do when it goes wrong and when to stop and ask. The owner approves it before anyone relies on it.

    Starts it
    Operations lead
    Brings
    notes, document, pasted text
    Gets
    2 outputs