Workflows Directory

Find your team’s next superpower.

Results

10 workflow templates

  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

    Starts it
    Operations manager
    Brings
    export, notes, document
    Gets
    7 outputs
  • Emissions activity data schedule

    When the reporting period closes, the environmental reporting owner gets one source-linked schedule of energy, fuel and transport quantities with units and the boundary supplied, estimates kept apart from measured activity, missing factor references and gaps listed. It calculates no emissions figure.

    Starts it
    Environmental reporting owner
    Brings
    export, notes
    Gets
    5 outputs
  • Engineering change affected records index

    When an engineering change request enters review, the document controller gets one index: the assemblies, revisions, stock and open purchase orders the change reaches in the exports supplied, and a question for each owner wherever the records are unclear.

    Starts it
    Document controller
    Brings
    export, notes
    Gets
    3 outputs
  • Lone work arrangements review

    For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.

    Starts it
    Operations manager
    Brings
    export, notes
    Gets
    6 outputs
    • Health, safety and environment (filtered by)
    • Energy (filtered by)
    • Real estate (filtered by)
  • Preventive maintenance plan

    For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.

    Starts it
    Facilities manager
    Brings
    export, notes
    Gets
    6 outputs
  • Punch list consolidation

    The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
  • Recurring repair service history

    When repeated maintenance keeps disturbing guests, the facilities manager gets one brief by equipment and room area: repeated work orders, confirmed service interruptions and missing inspection records side by side. It finds no cause and orders no work.

    Starts it
    Facilities manager
    Brings
    export, notes
    Gets
    5 outputs
  • Spreadsheet check before sharing

    Before a model or schedule goes to a client, a lender or a board, the sender gets one report on it: every error value, short total, buried assumption and hidden row pinned to its cell, each with a fix or a question, and a plain list of what was not checked. Nothing in the workbook is changed.

    Starts it
    Finance manager
    Brings
    export, notes
    Gets
    5 outputs
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Temporary change register

    For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs