Workflows Directory
Find your team’s next superpower.
- Function: Health, safety and environment
- Function: Quality management
- Industry: Engineering firms
- Industry: Hospitality
- Clear all filters
Results
11 workflow templates
Audit evidence index
The quality lead gets an index of everything an audit has asked to see: each request linked to the document that answers it, its version and owner, the records found and the gaps. The quality owner decides what is shared; nothing is certified or sent.
- Starts it
- Quality lead
- Brings
- export, notes
- Gets
- 6 outputs
Deliverable issue completeness check
As a calculation, report or drawing package nears issue, the quality reviewer or document controller gets a checklist: missing review records, revisions that disagree between the index, the register and the title block, and citations of out-of-date calculations. Issue stays with the engineers.
- Starts it
- Quality reviewer
- Brings
- export, notes
- Gets
- 5 outputs
Emergency drill brief
Before a fire, evacuation or other drill, the site or office manager gets one brief: the scenario the responsible person has approved, who does what, what each observer records, and the questions for the debrief. It writes no emergency plan.
- Starts it
- Site manager
- Brings
- export, notes
- Gets
- 4 outputs
Preventive maintenance plan
For one site, the facilities or operations manager gets every piece of equipment ranked by failure cost, an approach for each (run to failure, scheduled or condition-based), a dated calendar of tasks from the maker's guidance and the failure history, the spare parts to hold and the downtime measures to track.
- Starts it
- Facilities manager
- Brings
- export, notes
- Gets
- 6 outputs
Punch list consolidation
The site manager gets the punch list for the next closeout walk as one list grouped by location and trade, with repeated entries merged, photographs attached and a proposed follow-up date for each open item. Nothing is assigned, closed or accepted.
- Starts it
- Site manager
- Brings
- export, notes
- Gets
- 7 outputs
Recurring repair service history
When repeated maintenance keeps disturbing guests, the facilities manager gets one brief by equipment and room area: repeated work orders, confirmed service interruptions and missing inspection records side by side. It finds no cause and orders no work.
- Starts it
- Facilities manager
- Brings
- export, notes
- Gets
- 5 outputs
RFI review package
The project engineer gets one packet for each request for information: the register entry, the question word for word, the drawing revisions and specification extracts it touches, earlier responses, and a numbered list of what is unresolved. No answer is proposed.
- Starts it
- Project engineer
- Brings
- export, notes, pasted text
- Gets
- 8 outputs
Site observation follow-up
After a site visit, the visiting engineer and the project manager get one observation report: each field note beside its location, source photograph, drawing revision and any earlier register entry, a proposed follow-up owner, and the questions still open. It assesses no condition.
- Starts it
- Visiting engineer
- Brings
- export, notes
- Gets
- 5 outputs
Site safety induction pack
For one named site, the site, facilities or people lead gets an induction built from that site's own emergency arrangements, rules and hazards, with a short check of understanding, a sign-off record for each person and refresher dates by role. A competent person approves it and delivers it.
- Starts it
- Site manager
- Brings
- export, notes, document
- Gets
- 6 outputs
Submittal register review
The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.
- Starts it
- Project engineer
- Brings
- export, notes
- Gets
- 6 outputs
Workplace risk assessment
For one task or workplace, the site or operations manager gets each hazard, who could be harmed, the controls already in place, a likelihood-and-severity rating before and after, and further controls with an owner and a date, ready for a competent person to review and sign.
- Starts it
- Site manager
- Brings
- export, notes, document
- Gets
- 6 outputs