Workflows Directory

Find your team’s next superpower.

Results

39 workflow templates, showing 25 to 39

  • Quality management review pack

    Before the periodic quality review, the quality lead gets one brief for senior leaders: where each measure stands, complaints and defects, audit findings, action status, and the decisions still open. The leaders decide; the brief claims no compliance with any standard.

    Starts it
    Quality lead
    Brings
    export, notes
    Gets
    8 outputs
  • Recurring repair service history

    When repeated maintenance keeps disturbing guests, the facilities manager gets one brief by equipment and room area: repeated work orders, confirmed service interruptions and missing inspection records side by side. It finds no cause and orders no work.

    Starts it
    Facilities manager
    Brings
    export, notes
    Gets
    5 outputs
  • Repeat incident pattern review

    A safety lead with a year of incident records and earlier actions gets them compared in groups: confirmed causes, what was done before, and where incidents recur, with questions for the team. A competent person judges what the pattern means.

    Starts it
    Investigation lead
    Brings
    export, notes
    Gets
    6 outputs
    • Health, safety and environment (filtered by)
    • Quality management (filtered by)
    • Established businesses (filtered by)
  • Returned unit review brief

    When a failed-unit report or return request arrives, the service coordinator gets one brief tying the customer's report to each unit's shipment record, serial and recorded configuration, with unmatched serials and missing evidence listed. It names no cause.

    Starts it
    Service coordinator
    Brings
    export, notes, document, pasted text
    Gets
    7 outputs
  • RFI review package

    The project engineer gets one packet for each request for information: the register entry, the question word for word, the drawing revisions and specification extracts it touches, earlier responses, and a numbered list of what is unresolved. No answer is proposed.

    Starts it
    Project engineer
    Brings
    export, notes, pasted text
    Gets
    8 outputs
  • Safety walk follow-up

    After a safety walk, the manager gets a follow-up brief that ties each concern workers raised to the commitment the manager made, its owner and due date, and the message to give back. Gaps arrive as questions, never as guesses.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    5 outputs
    • Health, safety and environment (filtered by)
    • Established businesses (filtered by)
    • Construction
  • Shipment documentation check

    When a job finishes, the shipping or quality lead gets one index comparing the order, the inspection records, the required certificates and the packing details, with each missing record and each quantity that does not agree set out. Nothing is certified or released.

    Starts it
    Shipping lead
    Brings
    export, notes
    Gets
    6 outputs
  • Site observation follow-up

    After a site visit, the visiting engineer and the project manager get one observation report: each field note beside its location, source photograph, drawing revision and any earlier register entry, a proposed follow-up owner, and the questions still open. It assesses no condition.

    Starts it
    Visiting engineer
    Brings
    export, notes
    Gets
    5 outputs
    • Quality management (filtered by)
    • Established businesses (filtered by)
    • Construction
  • Site safety induction pack

    For one named site, the site, facilities or people lead gets an induction built from that site's own emergency arrangements, rules and hazards, with a short check of understanding, a sign-off record for each person and refresher dates by role. A competent person approves it and delivers it.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    6 outputs
    • People and HR
    • Health, safety and environment (filtered by)
    • Established businesses (filtered by)
  • SOP exception capture

    Turn what your most experienced person does with the awkward cases into an exception register for one procedure. Once the owner approves it, every colleague handles those cases the way your best person does.

    Starts it
    Operations lead
    Brings
    notes, document
    Gets
    2 outputs
  • Spreadsheet check before sharing

    Before a model or schedule goes to a client, a lender or a board, the sender gets one report on it: every error value, short total, buried assumption and hidden row pinned to its cell, each with a fix or a question, and a plain list of what was not checked. Nothing in the workbook is changed.

    Starts it
    Finance manager
    Brings
    export, notes
    Gets
    5 outputs
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Supplier quality response check

    A quality or purchasing person who has raised a defect with a supplier gets the supplier's reply set against the finding: what is answered, what is not, the evidence still to ask for, the actions proposed and what has yet to be verified. The person decides whether the answer is accepted.

    Starts it
    Supplier-quality owner
    Brings
    export, notes, document, pasted text
    Gets
    7 outputs
    • Quality management (filtered by)
    • Established businesses (filtered by)
    • Consumer brands
  • Temporary change register

    For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
    • Health, safety and environment (filtered by)
    • Established businesses (filtered by)
    • Construction
  • Workplace risk assessment

    For one task or workplace, the site or operations manager gets each hazard, who could be harmed, the controls already in place, a likelihood-and-severity rating before and after, and further controls with an owner and a date, ready for a competent person to review and sign.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    6 outputs
    • Health, safety and environment (filtered by)
    • Established businesses (filtered by)
    • Construction