Workflows Directory

Health, safety and environment for growth & scaling in construction

Results

6 workflow templates

  • Contractor safety prequalification

    For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.

    Starts it
    Operations manager
    Brings
    export, notes, document
    Gets
    7 outputs
  • Ergonomic review inputs

    For a supervisor preparing for an ergonomics assessor or a worker's complaint about a task: a task observation record of each step's movements, durations, loads and measurements as supplied, the measurements still missing, and what the people who do the task said.

    Starts it
    Supervisor
    Brings
    export, notes
    Gets
    4 outputs
    • Health, safety and environment (filtered by)
    • Construction (filtered by)
    • Growth & scaling (filtered by)
  • Lone work arrangements review

    For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.

    Starts it
    Operations manager
    Brings
    export, notes
    Gets
    6 outputs
    • Health, safety and environment (filtered by)
    • Construction (filtered by)
    • Growth & scaling (filtered by)
  • Site safety induction pack

    For one named site, the site, facilities or people lead gets an induction built from that site's own emergency arrangements, rules and hazards, with a short check of understanding, a sign-off record for each person and refresher dates by role. A competent person approves it and delivers it.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    6 outputs
    • People and HR
    • Health, safety and environment (filtered by)
    • Construction (filtered by)
  • Temporary change register

    For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
    • Health, safety and environment (filtered by)
    • Construction (filtered by)
    • Growth & scaling (filtered by)
  • Workplace risk assessment

    For one task or workplace, the site or operations manager gets each hazard, who could be harmed, the controls already in place, a likelihood-and-severity rating before and after, and further controls with an owner and a date, ready for a competent person to review and sign.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    6 outputs
    • Health, safety and environment (filtered by)
    • Construction (filtered by)
    • Growth & scaling (filtered by)