Workflows Directory

Find your team’s next superpower.

Results

30 workflow templates, showing 25 to 30

  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Temporary change register

    For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
  • Vendor insurance certificate check

    For a property manager collecting insurance certificates from service vendors: each certificate's fields set beside the requirements the team already approved, every stated expiration date listed, and draft requests for what is missing. The manager reviews gaps with the insurance adviser before accepting anything.

    Starts it
    Property manager
    Brings
    export, notes, document, pasted text
    Gets
    9 outputs
  • Volunteer shift options

    A volunteer lead gets draft shift options once an event's availability replies are in: each role's needs set against who volunteered, the requirements on record and the shifts already confirmed, with every uncovered position shown. The lead checks and confirms; nothing is assigned or sent.

    Starts it
    Volunteer lead
    Brings
    export, notes
    Gets
    4 outputs
    • People and HR
    • Operations and process improvement (filtered by)
    • Education (filtered by)
  • Workflow fit check: is this piece of work ready for AI?

    Before you build anything, run one piece of work through six checks and get a straight answer on one short page: build it, build one part, do something simpler first, not yet, or leave it with your people. The owner decides what gets built first, with the reasons in front of them.

    Starts it
    Owner
    Brings
    notes, pasted text
    Gets
    6 outputs
    • Operations and process improvement (filtered by)
    • Construction (filtered by)
    • Growth & scaling
  • Workplace risk assessment

    For one task or workplace, the site or operations manager gets each hazard, who could be harmed, the controls already in place, a likelihood-and-severity rating before and after, and further controls with an owner and a date, ready for a competent person to review and sign.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    6 outputs