Workflows Directory

Find your team’s next superpower.

Results

32 workflow templates, showing 25 to 32

  • Site observation follow-up

    After a site visit, the visiting engineer and the project manager get one observation report: each field note beside its location, source photograph, drawing revision and any earlier register entry, a proposed follow-up owner, and the questions still open. It assesses no condition.

    Starts it
    Visiting engineer
    Brings
    export, notes
    Gets
    5 outputs
  • Site safety induction pack

    For one named site, the site, facilities or people lead gets an induction built from that site's own emergency arrangements, rules and hazards, with a short check of understanding, a sign-off record for each person and refresher dates by role. A competent person approves it and delivers it.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    6 outputs
    • People and HR
    • Operations and process improvement (filtered by)
    • Construction (filtered by)
  • Stakeholder and decision rights map

    Before kickoff, the project manager holds one map of everyone the project touches: each group placed by influence and interest, every key decision with exactly one accountable owner, the decision makers still missing, and who hears what, when and from whom. The sponsor confirms every decision right.

    Starts it
    Project manager
    Brings
    export, notes, document
    Gets
    6 outputs
  • Submittal register review

    The project engineer gets one register of every required submittal: what has arrived, the review status as recorded, the documents still missing and the long-lead items at risk against the date each order must be placed. Nothing is routed, accepted or ordered.

    Starts it
    Project engineer
    Brings
    export, notes
    Gets
    6 outputs
  • Temporary change register

    For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs
  • Vendor insurance certificate check

    For a property manager collecting insurance certificates from service vendors: each certificate's fields set beside the requirements the team already approved, every stated expiration date listed, and draft requests for what is missing. The manager reviews gaps with the insurance adviser before accepting anything.

    Starts it
    Property manager
    Brings
    export, notes, document, pasted text
    Gets
    9 outputs
  • Workflow fit check: is this piece of work ready for AI?

    Before you build anything, run one piece of work through six checks and get a straight answer on one short page: build it, build one part, do something simpler first, not yet, or leave it with your people. The owner decides what gets built first, with the reasons in front of them.

    Starts it
    Owner
    Brings
    notes, pasted text
    Gets
    6 outputs
    • Operations and process improvement (filtered by)
    • Construction (filtered by)
    • Growth & scaling
  • Workplace risk assessment

    For one task or workplace, the site or operations manager gets each hazard, who could be harmed, the controls already in place, a likelihood-and-severity rating before and after, and further controls with an owner and a date, ready for a competent person to review and sign.

    Starts it
    Site manager
    Brings
    export, notes, document
    Gets
    6 outputs