Workflows Directory

Find your team’s next superpower.

Results

6 workflow templates

  • Engineering change affected records index

    When an engineering change request enters review, the document controller gets one index: the assemblies, revisions, stock and open purchase orders the change reaches in the exports supplied, and a question for each owner wherever the records are unclear.

    Starts it
    Document controller
    Brings
    export, notes
    Gets
    3 outputs
    • Operations and process improvement (filtered by)
    • Energy (filtered by)
    • Hardware and physical technology (filtered by)
  • Job readiness packet

    Before an order goes to the floor, the production or quality lead gets one packet: each requirement matched to its approved drawing, specification or inspection plan, with conflicting revisions, gaps and material shortfalls listed. The owners decide; nothing is approved or released.

    Starts it
    Production planner
    Brings
    export, notes
    Gets
    5 outputs
    • Operations and process improvement (filtered by)
    • Hardware and physical technology (filtered by)
    • Established businesses
  • Lone work arrangements review

    For each task someone does alone, the manager gets the check-in method, the places where nobody could be reached, who responds when a check-in is missed and how soon, and alternatives. A competent person decides what is acceptable.

    Starts it
    Operations manager
    Brings
    export, notes
    Gets
    6 outputs
  • Production schedule rebuild

    When orders or forecasts change, the production planner gets a draft build schedule from open orders, work-centre capacity and material availability, with every overload and shortage listed, not quietly fixed. The planner checks feasibility and approves the changes.

    Starts it
    Production planner
    Brings
    export, notes
    Gets
    7 outputs
    • Operations and process improvement (filtered by)
    • Hardware and physical technology (filtered by)
    • Consumer brands
  • Service visit work packet

    Before a planned visit to a turbine, inverter or terminal asset, the maintenance supervisor gets one packet built from the logs and approved scope supplied: reported symptoms, previous visits, open parts requests and access questions. It judges no condition and sends nothing.

    Starts it
    Maintenance supervisor
    Brings
    export, notes
    Gets
    7 outputs
  • Temporary change register

    For a site or operations manager with temporary changes to equipment, layout or process still in place: a register of every change with its expiry date, the checks still outstanding and the procedures and training it touches, ready for the competent person who decides what happens next.

    Starts it
    Site manager
    Brings
    export, notes
    Gets
    7 outputs