Academic calendar check
While year, term and session dates are being assembled, your registrar gets a draft calendar with every registration window tied to its term, and every conflicting, missing or out-of-bounds date listed as a question. Nothing is published or changed.
- Starts it
- Registrar
- Brings
- export, notes
- Gets
- 3 outputs
Bid or no-bid and RFP response plan
Before anyone starts on a response, your bid manager sees every requirement in the request checked against your own evidence, your bid criteria tested and the buyer questions ready. A named person decides whether to bid; then a dated plan says who does what by when.
- Starts it
- Bid manager
- Brings
- export, notes, document
- Gets
- 6 outputs
Business insurance renewal review
Before the business insurance renews, the owner gets one pack: every policy with insurer, limits, deductibles, premium and dates; renewal terms beside expiring ones, every change marked; what changed in the business; claims; and questions for the broker. The broker and the owner decide all cover.
- Starts it
- Owner
- Brings
- export, notes, document
- Gets
- 8 outputs
Carrier performance review
The shipping lead gets a lane-by-lane comparison of carriers from the delivery export and the freight charges: on-time delivery, damage, tracking gaps and cost, each with the shipments behind it. A person decides whether to raise issues or change carrier.
- Starts it
- Shipping lead
- Brings
- export, notes
- Gets
- 5 outputs
Category sourcing plan
For the buyer or operations lead who owns one spend category, such as packaging or IT hardware: its spend and suppliers on one page, where it sits on a supply-risk and spend matrix, the value levers the evidence supports, and a dated sourcing plan. A person chooses the approach.
- Starts it
- Buyer
- Brings
- export, notes
- Gets
- 7 outputs
Component end-of-life exposure brief
When a supplier announces a component constraint or end-of-life date, the sourcing lead gets one brief: where the part is used, stock and demand set against the stated dates, and questions about replacements, with unverified availability kept apart from approved supply.
- Starts it
- Sourcing lead
- Brings
- export, notes, pasted text
- Gets
- 5 outputs
Contract intake brief
When another party's agreement arrives, counsel gets a one-page intake brief: what it is, read from its titles, the parties as named, what is missing, the requester's purpose and date, and the reviewer your own routing rules name. It comments on no term; counsel decides.
- Starts it
- Contracts manager
- Brings
- notes, document, pasted text
- Gets
- 6 outputs
Prepares work for a lawyer. Not legal advice.
Contract renewal and notice register
From your signed agreements and amendments, the contracts manager gets a register for counsel to confirm: each term, renewal and notice clause quoted with its section, cancel-by and send-by dates proposed only under counsel's own counting rules, and the windows sorted by proposed send-by date. Nothing is sent.
- Starts it
- Contracts manager
- Brings
- export, notes, document
- Gets
- 5 outputs
Prepares work for a lawyer. Not legal advice.
Contractor safety prequalification
For a named job, the operations, facilities or site manager gets a safety questionnaire scaled to the risk of the work, then a record of the contractor's answers scored only on the evidence supplied, with every gap, the conditions that close it and a review date. A competent person decides.
- Starts it
- Operations manager
- Brings
- export, notes, document
- Gets
- 7 outputs
Course sequence and workload review
A course lead revising an outline for the next cohort gets a module map: learning goals, prerequisites, activities and the instructor's own time estimates, with crowded weeks and coverage gaps marked and every gap written as a question. The course lead decides what changes.
- Starts it
- Course lead
- Brings
- export, notes
- Gets
- 4 outputs
Deliverable issue completeness check
As a calculation, report or drawing package nears issue, the quality reviewer or document controller gets a checklist: missing review records, revisions that disagree between the index, the register and the title block, and citations of out-of-date calculations. Issue stays with the engineers.
- Starts it
- Quality reviewer
- Brings
- export, notes
- Gets
- 5 outputs
Design assumption change register
When client criteria or design assumptions change, the project engineer gets one sourced register: what changed, which recorded requirements it touches, how firm each source is, and what still needs confirmation. No design basis is altered.
- Starts it
- Project engineer
- Brings
- export, notes
- Gets
- 6 outputs
Discipline interface issue register
After a coordination meeting exposes conflicts between disciplines, the design coordinator gets one register: each conflict from the minutes, linked to the clash-export rows and model revisions involved, with the lead who owns each system and the decision still needed. Nothing is resolved.
- Starts it
- Design coordinator
- Brings
- export, notes, document
- Gets
- 5 outputs
Estimate basis pack
An estimator pricing a job from drawings, takeoffs and supplier quotes gets one worksheet: every figure with its quantity source, rate source and date beside it, each exclusion listed and every gap already written as a scope question. The estimator verifies; the bid lead decides the figure.
- Starts it
- Estimator
- Brings
- export, notes
- Gets
- 4 outputs
Inbound receiving exception trace
When what arrived does not match the advance shipment notice, the receiving supervisor or inventory controller gets the notice, the packing list and the scans side by side by item and lot, with missing references and questions to investigate. Nothing is adjusted and nobody is contacted.
- Starts it
- Receiving supervisor
- Brings
- export, notes
- Gets
- 5 outputs
Meeting agenda, notes and follow-ups
Whoever runs the meeting walks in with an agenda where every topic has an outcome and a time, and walks out with a one-page record: what was decided, who owns each action and by when, and what is still open. Nothing reaches anyone until that person has read it and sends it.
- Starts it
- Team lead
- Brings
- notes
- Gets
- 4 outputs
Order size comparison
When a supplier offers a bigger discounted order, the inventory planner gets each quantity costed the same way: yearly cost, cash tied up, months of cover and storage fit. The planner chooses the quantity; nothing is ordered.
- Starts it
- Inventory planner
- Brings
- export, notes
- Gets
- 6 outputs
Pilot build readiness brief
Before a prototype or pilot build, the build lead gets one brief: part shortages, revision conflicts and open actions set against the team’s own build checklist, with allocated parts kept apart from received ones. People confirm; nothing is released.
- Starts it
- Build lead
- Brings
- export, notes, document
- Gets
- 7 outputs
Premortem before a decision
Before your team commits to a plan that is hard to undo, such as a move, a launch or a new system, a short workshop pictures it a few months on, already failed. The record ranks the reasons, turns each top risk into a check, a warning sign and an owner, and leaves the go decision with the owner.
- Starts it
- Owner
- Brings
- notes
- Gets
- 4 outputs
Program outcome map
Before an evaluation, the program and evaluation leads get one map linking each activity to the outcome it is meant to serve, with proposed measures, data sources, assumptions and the questions the evidence cannot yet answer. It claims no impact.
- Starts it
- Program lead
- Brings
- export, notes
- Gets
- 8 outputs
Project handover readiness check
When a finished deliverable is ready for the team that will run it, the project manager brings one checklist against that team's own requirements: acceptance evidence, instructions, access, training, support owners and open items. The receiving owner accepts or names the conditions still to meet.
- Starts it
- Project manager
- Brings
- export, notes
- Gets
- 6 outputs
Project lessons review
When a phase or a project ends, the project manager gets one blameless review: whether it achieved what it was for, how scope, schedule and budget moved and why, whether the success measures were the right ones, and practice changes for the team to choose, each with an owner and a follow-up date.
- Starts it
- Project manager
- Brings
- export, notes
- Gets
- 8 outputs
Project scope baseline
A project manager turns an approved brief into a draft scope baseline: the deliverables, what is excluded, the acceptance criteria for each deliverable, the constraints and the open questions for the sponsor. Nothing implied counts as scope until the sponsor says so.
- Starts it
- Project manager
- Brings
- export, notes, document
- Gets
- 7 outputs
Project status report
The lead of an internal project gets a status report the sponsor can read in two minutes: each workstream red, amber or green with the reason, what moved, who must clear each blocker, the decisions needed and the dates at risk. No milestone is called done without evidence, and the lead confirms every status.
- Starts it
- Project lead
- Brings
- export, notes, pasted text
- Gets
- 7 outputs